December 29, 2007
Back from the Christmas break and ready to address the outstanding Christmas orders. We will contact by email those concerned. Better take the time now to wish you all a very Happy New Year.
December 14, 2007
Okay so we are getting nearer to Christmas and the Santa character is getting close. Time to get any orders in to avoid the Christmas rush and slow postal service. We will be taking three days off at Christmas this year so any orders during that period will be attended to as soon as possible.
We have built a few more of the Thermaltake VA8000B cases they are here.
December 08, 2007
The first of our Radiical water cooled cases the Thermaltake VA8000B can be found here.
November 26, 2007
We have decided to water cool the Thermaltake Armor for our first water cooled case. The cooling system will be based on the FuZion CPU block and the Laing D5 pump unit plus of course our own Radiical modifications. There will be a split triple radiator system (2 and 1) to provide for some expansion in the future. The first case unit will be available soon.
November 22, 2007
We have added Andrews Final Setup Project to our customers Gallery. The interesting thing about this project is the degree of complexity involved in setting up two loops using three radiators and cooling four hard drives. Well worth a look.
Our first water cooled case will be available soon. More details shortly.
November 11. 2007
Today we have the Danger Den Pump Relay Switch Kit for AC pumps. The relay switch kit can be found here.
October 24, 2007
We have a received a very small shipment of the D-TEK accelerator nozzle kits for the FuZion Block. Those of you who pre ordered will be notified by email. The balance are now available until sold out.
October 15, 2007
Added Nickel Plated SLI bridge kit to fittings page.
Testing is almost completed on the D-Tek nozzles. Findings to be published shortly.
October 05, 2007
We have now received the D-Tek nozzles and gasket kit for testing. During the next few days Igor and I will be subjecting the nozzles to a bit of pressure, flow rate and temperature testing. We have already picked our own favorite performer but we will wait to announce the best all rounder when testing is completed. To simplify the process we will be testing with the Laing Vario D5 pump for this first series. We will then move on to test using the modified DDC pumps at a later date.

September 25, 2007
We have finally completed a six months of evaluation of our own Radiical tubing compound. The new tubing is available from today in all of the commonly used sizes. This tubing compound exhibits very good flexibility, conformity and resists clouding. Details can be found on the tubing page.
September 17, 2007
Today we are introducing the Series three version of our popular Radiical Turbo Head pump top for the Laing DDC 3.2 Pump. More details can be found here.
We have also added Helicoil's to suit 3/8" tubing in Alien Green UV colour here.
September 13, 2007
Today we add another project to our Customer Gallery with the introduction of Adam's Dual Loop V2000 Project. This project is particularly interesting because it incorporate two of our Slimline Triple radiators internally. This project also uses our Radiical Turbo Head top to service one of the loops. The performance of the triple radiators should be of interest to those of you who have emailed in for specific performance data. More detail can be found here.
September 11, 2007
Live testing continues today after a block remount.
September 10, 2007
With the imminent release of the first quad core AMD CPU's we have started live testing our Antec 900 case project. We will be running some baseline trials prior to full load testing for the next few days.
August 31, 2007
Today we have added Zalman Ramsinks to our Fans Page here.
August 30, 2007
Part Three of the Antec 900 project looking at performance can be found here.
August 25, 2007
Today we have part two of the Antec 900 project. It can be found here.
August 18, 2007
Part one of our Antec 900 case project is now posted. We have called this one the "Tardis" Project. It can be found here.
August 17, 2007
Final run at 3.7Ghz on our rough overclocking of the Quad 6600 today.
August 16, 2007
A bit more Quad core overclocking today as we move up to 3.6Ghz. Check it out here.
August 15, 2007
We have stopped live testing of the Q6600 due to the erratic temperatures readings being generated from the version of Speedfan program we are using. The remainder of our early testing will be found on this page. We will be adding to this page in the next week or so as new data is made available.
August 14, 2006
We have started the burn in period for the Q6600 CPU today. Live testing is now organized and will be on and offline as we clock the CPU up over the next few days. We will setup a separate overclocking page very shortly so that the progress can be viewed.
August 11, 2007
After a bit of a delay waiting for our Antec 900 case to arrive we are now ready to start our project. Stay tuned for updates early next week.
We will also start testing our SRX D5 Extreme kit using Intel's Q6600 CPU on the Torture Rack. Check out our live testing page mid next week for details.
August 04, 2007
Today we have our second Quad core water cooling project for our Customer Gallery page . Check out Pixelmedia's use of our 120mm radiators in the Genesis Core 2 Quad project here.
August 01, 2007
We have decided that our next project will be built around the Antec 900 case.
We had hoped to see the release of the AMD Quad core by this time so that it could be incorporated at the first build point. Nevertheless we will build the project case cooling system and the quad core can be fitted at a later date. Stay tuned.
July 26, 2007
Today we have our first Case Gallery entry using Intel's Quad core in an Antec P180 case. The details for Omarko's project can be found here.
July 16, 2007
With the expected price reductions due shortly on the range of hotter quad core Intel Cpu's it might be timely to check out our water cooling fitting guide in this months Atomic Magazine.

July 11, 2007
Laing D5 pumps are back in stock.
A new range of D-TEK FX UV dyes and paints are now available on our FluidXP page here.
Limited numbers of the D-TEK FuZion GFX block suitable for the 8800 series cards are now available. Check the blocks page here.

July 09, 2007
Two more radiators have been added today. The Slimline 240 dual fan dual pass

and the Slimline 360 triple fan dual pass.

More details are available on our radiators page.
July 07, 2007
Today we have the latest in our small radiator range, The 120mm thin profile single radiator is suitable for case projects such as the P180 Project we conducted here on our projects page.

July 06, 2007
For those of you who have emailed asking about the return of the triple single pass radiators we can confirm that we have received new stock of the Radiical Triple Ultra single pass Radiators.
July 05, 2007
We have added h4xxors P180 project to our customer gallery here.
New additions are the Acrylic Bay Reservoir shown below. More pictures and a product description can be found here.
June 24, 2007
Well its that time of year to service your water cooling system in preparation for the upcoming hot summer season.
We will be adding a number of new products in the next few weeks including the D-TEK FuZion-GFX video block and an extended range of radiators to meet the changing needs of CPU's and graphics cards.
Due to the volume of requests we will also be offering a kit form of our very popular P180 project in a triple radiator configuration. We will extend this to include pre fitted case systems in the next few weeks.
Following on from the introduction of the ATI 2900XT video cards Danger Den have released details of Maze 5 compatibility and fitting. These details can be found here.
June 07, 2007
In response to the many people who have requested it we have added half inch tubing size to our range of Excellon tubing. The tubing dimensions can be found on our Tubing page here.
May 18, 2007
Today we have added nickel plated barbs suitable as replacements for the standard plastic Thermochill radiator barbs. These can be found on our fittings page here. The barbs are available in two sizes suitable for 1/2" or 3/8" ID tubing.
We have completed our in house testing of the FuZion block and we are very happy with its performance. We will continue testing the block and several injector nozzles we have been working on. Results of this testing will be posted at a later date.
April 30, 2007
Added blue UV reactive Helicoil's to the Tubing page here.
A UV reactive 120 mm radiator has been added to the radiators page.

April 27, 2007
New stock of the Delrin Turbo Head tops for Laing DDC pumps have arrived.
April 25, 2007
Lest We Forget
They shall grow not old. As we who are left grow old. Age shall not weary them. Nor the years condemn. At the going down of the sun. And in the morning. We will remember them. Lest We Forget
April 23, 2007
We have available a limited number of our Evolution Pumps suitable as replacement pumps on Bigwater and similar kits. These can be found here.
April 17, 2007
Today we have two new kits based around the D-TEK FuZion water block. Details of these kits can be found on our kits page here. Both of these kits represent a break away from our traditional kits with the inclusion for the first time of a "T" line filling option. We have included this option so that the kits are made more suitable for small case application.
April 16, 2007
Tygon 5/16" tubing is now back in stock here. The new stock of the Laing D5 pumps have also arrived.
April 14, 2007
Thank you for the many emails about the Antec P180 project. We do not intend to market a kit for this conversion at this time.
We are out of stock of the Delrin Turbo head tops for Laing DDC pumps. We expect a delay of about a week before new stock is available.
April 09, 2007
We are making the final adjustments to two new water cooling kits for the Core2 Duo and Quad cored Intel CPU's. These kits will be based on The D-Tek FuZion CPU water block. We will be releasing two versions of these kits. One will be structured around a dual radiator the other more powerful kit will use our popular triple radiator. We anticipate that these kits will be suitable for AMD quad cores when they are released.
April 05, 2007
The Antec P180 case project has now been posted and is located here .
Radiical Computing would like to offer their congratulations to Enspire Digital on the performance of their water cooled PC featured in PC Authority April magazine. This is pretty exciting news as the custom cooling was provided by Radiical Computing.
April 04, 2007
The Antec P180 case project is nearing completion and should be posted in the next few days.
April 02, 2007
Today we have stock of the D-Tek FuZion water block. This is the water block that caused quite a stir recently when it significantly outperformed other leading water blocks in a water block shoot out. The major features of the D-Tek Fuzion are provided here on our water blocks page. We are very impressed with the manufacturing quality and presentation of this water block and we think you will agree that the FuZion block represents a major move forward.

March 23, 2007
Today we are adding another customer project the PraZStar Project. More detail here.
Other news is the Dtek FuZion block should arrive early next week.
March 20, 2007
We are introducing the Radiical Pin Block today. This block is discussed at greater length here.
Other news is that we will be stocking the Dtek FuZion water block shortly. More detail on this sought after water blocks arrival will be made available when we finalize arrangements.
March 13, 2007
The news for today starts off with the introduction of our new Easy2Fit barbs. These barbs are manufactured to suit 7/16" and 3/8" tubing. The design we have selected for our own barbs is in line with other designs on the market. We have however aimed at placing this barb between the popular 7/16" and the emerging 3/8" tubing sizes. Struggling to fit 7/16" tubing onto 1/2" barbs is now a thing of the past with this new barb sizing. We will initially be including the new barbs on our 7/16" based kits. We will also be fitting the new barbs to a center impingement block that we are about to release.
The second item of news relates to our next project due out shortly. In this project we will be water cooling the popular Antec P180 case. We have now concluded bench testing the components for this project so the project is nearing completion. Yes, is the answer to the many people who have emailed in requesting lots of pictures of the project as it progresses.
February 20, 2007
We are starting off our Customer Gallery today with a project by ShadoX using one of our Evolution kits. We will be adding to the Customer Gallery in the next few weeks as more entries are written up for posting on the page. We invite users of our products to submit their projects so that others can gain experience in the building of their own water cooling systems.
February 17, 2007
The results for our Danger Den Torture Rack project have been posted here.
January 25, 2007
We have posted the detail about our modification of the ResRad 2 on the reservoirs page and also here. you
January 24, 2007
We are entering the last two days of public display of live testing starting from today. We will write up some of the results we have found with the Danger Den Torture Rack with an emphasis on our own product performance in the next week or so.
January 22, 2007
For those of you interested in our live testing page we will be running some live testing during game play to evaluate performance. With a healthy 31 degree Celsius ambient it is going to be an interesting test period.
January 19, 2007
New stock of the 250 mm long ResRad has arrived. Colour's available are Red, Black and Blue. A smaller 180mm long version or the ResRad suitable for smaller cases is also now available.

We are currently looking at increasing the function of the smaller ResRad more details later.
January 18, 2007
The Radiical Chipset is now back in stock.
January 10, 2007
The Delrin Turbo Head Tops are back in stock.
January 07, 2007
For those of you who have pre-ordered the Delrin Turbo Head tops. The new batch will be arriving on Wednesday of next week.
January 05, 2007
We have posted the part one and the second part of our Danger Den Torture Rack article here on the projects page.
January 04, 2007
Happy new year to you all and we wish you all the best for the New Year.
News from Radiical is that the Radiical Delrin Turbo Head tops will be back in stock next week.
We are currently in the process of producing our own barbs for 7/16" tubing. We are looking at calling these Eazy2fit barbs because they take all the work out of using 7/16"ID tubing. No more straining to fit the tubing over the barbs makes our job easier so we hope you like them when they arrive. We will be adding these to our fittings page.
We will have part two of the Danger Den Torture Rack guide up soon which has turned into something of a project. We are currently finishing up the article which deals with water cooling practically all of the computer hot spots. We anticipate that the project/guide will be posted tomorrow.
Copyright of Radiical Pty Ltd 2006 |